EOLDeskMainstream support to 2028

Two adapters decide whether your BizTalk migration is a lift or a redesign.

The bindings file lists every send port and receive location. What matters is which adapters they use: file and FTP move cheaply, IBM MQ and SAP need an integration service environment or a gateway, and that is the budget.

Readiness report · BizTalk · EOL Desk · checked by a person before it is sent

What we need from you

  • The application's Bindings.xml export
  • No server access, no credentials in the file
  • An orchestration list if you have it; the ports are the scoping question

Files stay on a private volume, are never shared, and are deleted on request. An NDA on your paper is fine.

Counted evidence, from the sample

AdapterPortsLogic Apps equivalent
FILE11Azure Blob or SFTP
WCF-SQL3SQL connector
MQS2none in consumption plan
FTP2FTP connector
SMTP2Office 365
WCF-SAP1SAP connector, gateway required
Exhibit 1 — 25 ports across 9 adapters, six shown. The MQ and SAP rows are the ones that turn a lift into a redesign, and they are two of twenty-five ports.

What the sample found

25
ports across 9 adapters — Each adapter is a separate connector, credential and failure mode in the target platform.
2
adapters with no clean Logic Apps equivalent — IBM MQ and SAP need an ISE or an on-premises gateway. Price these before the rest of the migration.
11
file ports on one UNC share — Who watches those folders today is the workflow that breaks first when they become blob triggers.

Read the full sample report — the same code, run against a synthetic estate.

Turnaround

Two business days from the file arriving. Late for a reason on our side and the report is free.

Deliverable

The document, one revision, and the machine-readable findings file. Yours to forward.

Scope

Counted findings and an effort floor. Not a licence audit and not a migration quote.

$2,500per system, one-time

No account, no access to your systems, and the findings file ships with the document.

Upload the bindings file
Other reports
Delphi / VB6Compiler unsupported since 2008$2,500
Dynamics GPSupport ends 31 December 2029$2,500
SAP ECCMainstream maintenance ends 2027$4,500
VMwarePer-core renewal, every year$1,500
Gentran/SterlingAcquired product, no vendor priority$3,500
EOL Desk · all samples · eoldesk.com